Expansion of the well-known shopping center, next to buildings such as Hampton Hotel by Hilton at the corner of Wspólna and Chałubińskiego Street, Oxygen Park Office Building -Aleje Jerozolimskie or extension of East Railway Station, is another investment in a characteristic place of the capital, carried out thanks to Paliander formwork. Galeria Mokotów has increased by nearly 5000 square metres. L-shaped annex of the area of 3500 m2 was built at the intersection of Uniechowskiego and Wołoska Street at the place of a supply zone. Work completed as planned between April and May 2013. The construction used a number of systems by Palisander, such as wall formwork Logo, engineering formwork Superslim, shoring tower ID-15 and MEP, timber-beam slab formwork PAL-20 or steel beams HEB. From technical point of view very interesting was slab formwork over floor “0” because of the difficult “geological” (slope and excavation) conditions preventing proper support. It required an overhang formwork at the length of 4.5 m.