“Marynarska” Intersection, Warsaw

Realization:
Oddział Centralny

Facility, located in the vicinity of the intersection Marynarska-Sasanki streets with railway line No. 8 Warszawa-Kraków, is part of the project of expressway S 79.
Supporting the construction of the superstructure with a full plate with a thickness of 1.20 m, a width of 9.40 m and a length of 140 m was made using Rapidshor and Slimshor formwork. In the plan viaduct is shaped in a horizontal curve. On a carrier plate road with a width of 7.10 m and both sides cornice width 1.25m were designed. Abutments which are end supports ware made in Logo formwork.

Systems used: