Route S19

Year of realization: 2020/2021, Place of realization: route Lublin-Rzeszów
Realization:
South Branch, Central Branch
Characteristics of the site:
engineering structures on 3 sections of the S-19 expressway

Palisander on site:

dedicated technical consulting

Interesting facts from the site:

  • In 2020, Palisander delivered formwork for the construction of all facilities implemented on a total of 3 sections of the S19 expressway Lublin-Rzeszów
  • The S19 road is part of the Via Carpatia route – a European “North-South” international route built in stages, connecting Klaipeda in Lithuania with Thessaloniki in Greece