Route S8 – Porosły Junction

Year of realization: 2019, Place of realization: Białystok
Realization:
Central Branch
Characteristics of the site:
Segment of the investment 2km in length – 5 engineering structures
Palisander on site:
dedicated technical consulting
Interesting facts from the site:
  • structure heights from 6.7 to 8.5m;
  • structure approx. 6m in height with span lengths up to 74m in a coupled, 4-beam construction;
  • structure erected over an arc, at a high angle of inclination with respect to the obstacle – 29.3 degrees and 67.4 degrees.