ALU-DEC
Strenght up to 40 kN the prop

Plastic plate

Speed of formwork removal

Quick and easy slab formwork

By using Mevadec  disassembly  is possible even after three days after concreting.
The innovative MevaDec panel system provides a very rapid rotation of formwork by using  drop heads. 19-cm head drop  provides easy removal of beams and panels, which due to their low weight can be transferred without the use of a crane on the upper floors.

MevaDec is used in three methods of formwork :

  • FTE method -drop head + wooden beams + panels
  • HN method – only the main beams and secondary beams with any facing
  • panel method – panels supported by slab beams